A field guide to insurance
Home

Builder's risk insurance: the policy that exists only while the work does

Halfway through your renovation, a fire takes the framing and the stacked lumber with it. Your home policy may shrug. This is the coverage built for exactly that stretch of time.

A blue paper house sheltered by layered protective paper walls.

The gap a standard policy leaves

A house under major renovation stops being a normal house for insurance purposes. Materials pile up where the living room used to be, the structure stands open to weather, and nobody sleeps there. New Hampshire's Insurance Department tells homeowners the answer is builder's risk insurance: it protects the structure and the building materials during construction against perils like fire, wind, and theft, and it should reflect the total project value - not the value of the old house.

What a real form actually covers

Actual builder's risk policies are more specific than the name suggests. One public form, from Utah's state risk management fund, covers buildings and structures while "in the course of construction, erection, or fabrication" - and extends to the materials and supplies that will become a permanent part of the building, on site or within 1,000 feet of it. Temporary structures, office trailers, fences, and scaffolding get their own coverage lines. Add-ons handle the less obvious costs: debris removal, the increased cost of rebuilding to current code (only if you actually rebuild, for similar occupancy), and soft costs - the expenses that pile up when a covered loss delays completion.

Oregon's risk management office, which writes builder's risk requirements into state construction contracts, notes the most frequent causes of loss are fire, theft, and vandalism. An unsecured job site full of copper and appliances is exactly what it sounds like.

Where the coverage stops

The same Utah form shows the boundaries plainly. Earth movement - earthquake, landslide, settling soil - is excluded. Flood is excluded. Water backing up through sewers is excluded. Oregon's contract language insists on all-risk coverage including earthquake and flood, which tells you those perils are negotiable but not automatic. The coverage period is the life of the project: Utah's form requires the project to be reported before work starts, expects a stated completion date, and puts the burden on the insured to ask for an extension if the job runs long. Let the project drift past its declared dates and the coverage can drift with it.

Who should be holding the policy

This is the question to settle before the first dumpster arrives, and the contract is where it gets settled. Oregon's standard clauses put the policy on the contractor, at the contractor's expense, for the full completed value, with the owner named as loss payee. Owner-placed builder's risk exists too, and for a homeowner managing a major remodel directly it may be the cleaner route. Either way, New Hampshire's regulator advises verifying a contractor's insurance before work begins - a certificate of insurance is a reasonable thing to ask for and an unreasonable thing to skip.

If any answer is vague, the gap is yours until it isn't - so before you sign the renovation contract, get written answers to four questions:

  • Who buys the builder's risk policy, and who is named on it?
  • Is the limit the full completed project value?
  • Are flood and earthquake covered, or excluded and priced separately?
  • Does it include soft costs if a covered loss delays completion?
General information only. Coverage and eligibility depend on the insurer, policy terms, and state requirements.

Sources & further reading

Official sources referenced for this guide. Source pages may change after publication.